- Highly contaminated site with some of the worst soil conditions
- Internationally monitored / Extremely high profile
- Deployed a team to watch the system on a 24 hours/day schedule (two 12-hour shifts)
- High flow
- Excavating next to a large body of water (False Creek)
Olympic Village
- Water Treatment
Metro-Can Construction
Customer
2007
Start date
Vancouver, BC
Location